IMPROVEMENTS….

Thanks to the membership, we have committed to tidying up the front of the clubhouse and the outside eating area – see above. The plaster work on this side of the building is in a pretty poor state, as is the combined granite, concrete, tarmac and mud medley on the ground by the entrance. To that end, the front of the clubhouse will be stripped back to the block work and re-rendered next week.  And we will be re-surfacing the area by the front door of the club with a resin-stone chip surface and making sure that it drains more efficiently.  Finally we’ll re-surface the outside eating area with resin and stone chips, lowering the wall so you can actually look out over the water when seated and adding a roof to give it a little more protection. This should – fingers crossed – all be done in time for opening up the bar and restaurant in the week starting 12th April.  

And finally, we have bought new sockets and a power unit and will be restoring power and lighting to the beach wall drekly!