25 Mar
2024

IMPROVEMENTS

We have put down the final layer of bonded resin on the outside covered terrace, fixed the steps and connected the railings. The clubhouse is now waiting for a few days of dry weather so that it can be painted. 

With much relief Henry from Helford Home Improvements has fitted the gutter and down-pipe so that you can now go out in the rain and avoid a shower as you enter and leave the gents.

A new kitchen door – scrounged and re-used from my dad’s house – has been put in and also awaits a break in the rain for painting.  

And finally, Ant and I have been clearing the over-grown plants on the huge wall in the car park. The intention is to plant a couple of Wisteria to grow up the wall.